Case Study – Kier Douglas Mill

Project:    Kier Construction – Douglas Mill, Bradford

Package:    Intumescent paint to cast iron columns and beams during refurbishment of a Victorian Mill which is being turned into a school.

Supplier:    Nullifire SC802 60 minutes intumescent
        
Overview:     Following the discovery by Kier that the existing intumescent paint may not be to correct thickness. In their professionalism Kier have extensively shot blasted and primed existing cast iron columns and beams to all levels (basement to level 4 incl).

Pyrotect have been contracted to re-apply Nullifire SC802 intumescent and ensure QA records are robust to give future users the confidence that the intumescent has been applied correctly and more importantly, to the correct thickness to give 60 min protection.

Our experienced team are here to assist you on similar projects.  Call us on 01530 416870.